項目管理:PMP模擬題精選3
The change control system includes--
a. Procedures to define how documents may be changed
b. Specific change requests expected on the project and plans to respond to each one
c. Performance reports that forecast project changes
d. A description of the functional and physical characteristics of an item or system
Qustions 3:
Typically, change control systems include automatic approval of certain types of changes. An example of such a change is one that is--
a. Suggested by the project sponsor
b. The result of an emergency
c. Suggested by the customer
d. Made mandatory by a new regulation
Qustions 5:
Rolling wave planning provides information on the work to be done--
a. Throughout all phases of the project
b. For successful completion of the current phases of the project
c. For successful completion of the current phase and subsequent phases of the project
d. In the next phase of the project
Qustions 2:
According to Herzberg’s motivator-hygiene Theory of Motivation, if achievement, recognition, responsibility, advancement or promotion, and positive supervisor attitude are not present, employees will--
a. Become alienated with the organization and leave
b. Lack motivation but will not be dissatisfied with their work
c. Lack motivation and become dissatisfied with their work
d. Become dissatisfied only if they do not receive salary increases
Qustions 4:
Problem solving, which is an important activity on projects, consists of --
a. Influencing the organizations to get things done
b. Defining problems and making decisions
c. Conferring with others to reach a dicision
d. Producing key results expected by stakeholders
Qustions 6:
Configuration management describes procedures to apply technical and administrative direction. Which of the following tasks is not performed in configuration management --
a. Identifying functional and physical characteristics of an item or system
b. Controlling changes to characteristics
c. Performing an audit to verifiy conformance to requierments
d. Allowing automatic approval of changes
本文內容來自自互聯(lián)網(wǎng)公開信息或用戶自發(fā)貢獻,該文觀點僅代表作者本人,版權歸原作者所有。本站僅提供信息存儲空間服務,不擁有所有權,不承擔相關法律責任。若發(fā)現(xiàn)侵權或違規(guī)內容請聯(lián)系電話4008352114或郵箱442699841@qq.com,核實后本網(wǎng)站將在24小時內刪除侵權內容。
本站推薦
- 1企業(yè)級管理中臺+工程項目管理級中臺,實現(xiàn)業(yè)務和資金、費用、成本管理的一體化的平臺
- 2工程公司的管理系統(tǒng)不僅限于項目管理,公司級的管理才是企業(yè)基業(yè)長青的基石
- 3工程項目管理系統(tǒng)的實施與企業(yè)主要功能優(yōu)化調整
- 4泛普工程項目管理系統(tǒng):工程企業(yè)精細化管理的利器
- 5基建項目管理系統(tǒng)的調試、檔案與考勤管理詳解
- 6甲方投資項目管理系統(tǒng)的全周期管控與技術架構解析
- 7基建項目管理平臺的構建總包管控與全周期管理新體系
- 8基建項目管理平臺的合約規(guī)劃與設計協(xié)作詳細介紹
- 9基建項目管理的新技術應用及設計變更操作介紹