監(jiān)理公司管理系統(tǒng) | 工程企業(yè)管理系統(tǒng) | OA系統(tǒng) | ERP系統(tǒng) | 造價(jià)咨詢(xún)管理系統(tǒng) | 工程設(shè)計(jì)管理系統(tǒng) | 甲方項(xiàng)目管理系統(tǒng) | 簽約案例 | 客戶(hù)案例 | 在線試用
X 關(guān)閉
軟件項(xiàng)目管理工具

當(dāng)前位置:工程項(xiàng)目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項(xiàng)目管理工具

PMP美國(guó)項(xiàng)目管理認(rèn)證考試模擬題精選6

申請(qǐng)免費(fèi)試用、咨詢(xún)電話:400-8352-114

 Qustions 1: 
Which statement about customer expectations is not true -- 

a. The product or service should be usable as intended. 
b. Contractual provisions, including schedule and performance standards, should be met. 
c. Changes should be made immediately, and all customer wants should be satisfied without bureaucratic hassle 
d. The seller should assume the responsibility of understanding customer needs and addressing them effectively. 

Qustions 3:

The document that describes the objectives, work content, deliverables, and end product of a project is the--

a.  Project charter 
b. Product description 
c. Scope statement 
d. WBS&nb
 sp;

Qustions 5:

Maintenance is crucially important to projects and should--

a. Be included as an activity to be performed during the closeout phase 
b. Have a separate phase in the life cycle in information systems projects because 60% to 70% of life-cycle costs of computer systems are generally devoted to maintenance 
c. Not be viewed as part of the project life cycle 
d. Always be viewed as a separate project 

Qustions 2: 
The WBS is an input to scope change control because it-- 

a. Provides information on project objectives 
b. Defines the project’s scope baseline 
c. Defines all project baselines 
d. Provides informat
 ion on scope performance 

Qustions 4:

When an organization chooses a project selection model, the most important criterion is --

a. Capability 
b. Realism 
c. Ease of use 
d. Cost 

Qustions 6:

A project manager’s company operates in a high-technology area requiring the integration and sharing of several functional specialties. The project manager is considering the appropriate organizational structure ofr a new project, the likely choice would be -- 

a. Matrix 
b. Tight matrix 
c. Functional 
d. Projectized 
網(wǎng)站提醒和聲明

本文內(nèi)容來(lái)自自互聯(lián)網(wǎng)公開(kāi)信息或用戶(hù)自發(fā)貢獻(xiàn),該文觀點(diǎn)僅代表作者本人,版權(quán)歸原作者所有。本站僅提供信息存儲(chǔ)空間服務(wù),不擁有所有權(quán),不承擔(dān)相關(guān)法律責(zé)任。若發(fā)現(xiàn)侵權(quán)或違規(guī)內(nèi)容請(qǐng)聯(lián)系電話4008352114或郵箱442699841@qq.com,核實(shí)后本網(wǎng)站將在24小時(shí)內(nèi)刪除侵權(quán)內(nèi)容。

發(fā)布:2026-02-28 12:02    編輯:xiaona    [打印此頁(yè)]    [關(guān)閉]

泛普軟件項(xiàng)目管理工具其他應(yīng)用

項(xiàng)目管理工具 禪道項(xiàng)目管理軟件 夢(mèng)龍項(xiàng)目管理軟件 微軟項(xiàng)目管理軟件 裝飾管理系統(tǒng) 裝修預(yù)算軟件 項(xiàng)目計(jì)劃軟件 項(xiàng)目進(jìn)度管理軟件 軟件項(xiàng)目管理工具 材料管理軟件 工程項(xiàng)目管理軟件系統(tǒng) 項(xiàng)目管理系統(tǒng) 施工管理軟件 建筑工程項(xiàng)目管理軟件 工程管理軟件