PMP認證考試練習(xí)題及參考答案(四十一)
A Authority
B Power
C Influence
D Leadership
E Motivation
ans:E
2 A project manager believes that the best way to manage is to form a good, harmonious working relationship with the team, and high performance will follow. The project manager could be defined as a _____ manager.
A 1,9
B 9,1
C 1,1
D 9,9
E 5,5
ans:A
3 Project leadership requires that the project manager pay attention simultaneously to the:
A Tasks to be performed and needs of the team
B Quantity and quality of the work to be performed 考試大(www.Examda。com)
C Efficiency and effectiveness of the team
D Time, cost and performance deliverables
E All of the above
ans:E
4 Which of the following can the project manager use as a means of measuring project team effectiveness?
A Absenteeism
B Sponsor-approved salary increases
C Efficiency of the team
D Turnover of personnel
E Grievances
ans:C
5 Most project management leadership theories focus on all of the following except:
A Personal characteristics of the project manager
B The situation at hand
C Personal traits of the subordinates
D Behavioral styles of the project manager
E Usefulness of authority and power in leadership
ans:C
6 Which theory(s) prescribes a form of participative management?
A theory X
B theory Y
C theory Z
D A or B
E B or C
ans:B
7 In which of the following organization(s) does the Functional Manager have the LEAST authority?
A coordinator
B weak matrix
C strong matrix
D functional
E expediter
ans:C
8 Project team building is most difficult in which type of environment?
A weak matrix organization
B strong matrix organization
C projectized organization www.Examda.CoM
D functional organization
E expediter organization
ans:A
9 The core function of the PM is
A client interfacing
B project integration
C quality assurance
D personal administration
E All of the above.
ans:B
10 Which of the following is based on an individual identification with a more powerful person.
A expert power
B reward power
C referent power
D A and B.
E A and C
ans:C
11 Which of the following results are Win/Win conflict resolution?
A compromising
B forcing
C problem solving
D smoothly
E withdraw
ans:C
12 Which of the following organizations has the best technical project control?
A matrix
B functional
C projectized
D B and C
E A and B
ans:D
本文內(nèi)容來自自互聯(lián)網(wǎng)公開信息或用戶自發(fā)貢獻,該文觀點僅代表作者本人,版權(quán)歸原作者所有。本站僅提供信息存儲空間服務(wù),不擁有所有權(quán),不承擔相關(guān)法律責任。若發(fā)現(xiàn)侵權(quán)或違規(guī)內(nèi)容請聯(lián)系電話4008352114或郵箱442699841@qq.com,核實后本網(wǎng)站將在24小時內(nèi)刪除侵權(quán)內(nèi)容。
本站推薦
- 1信息系統(tǒng)項目管理證書與PMP,為職業(yè)發(fā)展帶來的驚人機遇!
- 2信息系統(tǒng)項目管理師證書和pmp哪個更適合升職加薪?
- 3PMP項目管理泡軟件面臨的常見問題與挑戰(zhàn)分析
- 4PMP考試通過率及考生滿意度提升至90%以上:量化軟件項目管理成果的研究與實現(xiàn)
- 5歡迎登陸PMP項目管理系統(tǒng)——提升項目成功率的專業(yè)平臺!
- 6pmp證書和系統(tǒng)項目管理證書助你開啟高薪項目管理職場之路
- 7pmp證書助你馳騁職場與信息系統(tǒng)項目管理高薪秘籍曝光
- 8pmp證書助你開啟國際項目管理大門和信息系統(tǒng)項目管理師引領(lǐng)國內(nèi)項目管理之路
- 9PMP證書加持系統(tǒng)集成項目管理,開啟職場晉升新捷徑