PMP認證考試試題精選(3)
A. Cost budgeting
B. Cost estimating
C. Resource planning
D. Cost control
42. The Scope Statement is used in which process
A. Resource Planning
B. Cost Estimating
C. Cost Control
D. Cost Planning
43. Inputs into Resource Planning include:
A. Staffing requirements, procurement policies, Work Breakdown Structure
B. Work Breakdown Structure, Scope Statement, historical information, resource pool description, organizational policies
C. Work Breakdown Structure, Scope definition, resource pool description
D. Expert judgement, historical information, Work Breakdown Structure, Scope Statement
44. The term resource planning refers to:
A. Labor
B. Capital equipment
C. Materials
D. All of the above
45. Cost estimating includes all of the following except:
A. Identifying and considering various costing alternatives
B. Pricing strategy
C. Developing an assessment of the likely quantitative result
D. Baselining
46. Cost Estimating is most closely linked with which other process?
A. Procurement, Risk
B. Scope, Procurement
C. Time, Scope
D. Risk, Time, Integration
47. Parametric Modeling and Analogous Estimating are used in what process:
A. Cost Control Tools and Techniques
B. Cost Estimating Tools and Techniques
C. Risk Analysis Tools and Techniques
D. Risk Analysis Outputs
48. You are building the budget for your project. You dont have detailed requirements for the project yet. However, a fellow project manager completed a similar project A year ago, and has his budget assumptions and final costs documented. You decide to use this information as the basis of your cost estimating. This is called:
A. Analogous estimating
B. Parametric modeling
C. Bottom-up estimating
D. Spreadsheeting
49. As the Project Cost Engineer on a high rise development you are preparing your budget. You have developed a template, based on similar projects that can be used for buildings with 3-25 tories. It breaks out cost per square foot for plumbing, wiring, HVAC, dry wall, floors etc. This type of cost estimating is called:
A. Analogous estimating
B. Parametric modeling
C. Bottom up estimating
D. Spreadsheeting
50. Before you begin the cost budgeting process for building a new school you should make sure your cost engineer has given you:
A. Cost estimates, chart of accounts, cost baseline
B. Supporting detail, estimate at completion
C. Cost estimates and supporting detail,
D. Cost management plan, cost change control plan, cost baseline
本文內(nèi)容來自自互聯(lián)網(wǎng)公開信息或用戶自發(fā)貢獻,該文觀點僅代表作者本人,版權歸原作者所有。本站僅提供信息存儲空間服務,不擁有所有權,不承擔相關法律責任。若發(fā)現(xiàn)侵權或違規(guī)內(nèi)容請聯(lián)系電話4008352114或郵箱442699841@qq.com,核實后本網(wǎng)站將在24小時內(nèi)刪除侵權內(nèi)容。
本站推薦
- 1信息系統(tǒng)項目管理證書與PMP,為職業(yè)發(fā)展帶來的驚人機遇!
- 2信息系統(tǒng)項目管理師證書和pmp哪個更適合升職加薪?
- 3PMP項目管理泡軟件面臨的常見問題與挑戰(zhàn)分析
- 4PMP考試通過率及考生滿意度提升至90%以上:量化軟件項目管理成果的研究與實現(xiàn)
- 5歡迎登陸PMP項目管理系統(tǒng)——提升項目成功率的專業(yè)平臺!
- 6pmp證書和系統(tǒng)項目管理證書助你開啟高薪項目管理職場之路
- 7pmp證書助你馳騁職場與信息系統(tǒng)項目管理高薪秘籍曝光
- 8pmp證書助你開啟國際項目管理大門和信息系統(tǒng)項目管理師引領國內(nèi)項目管理之路
- 9PMP證書加持系統(tǒng)集成項目管理,開啟職場晉升新捷徑