PMP認(rèn)證考試試題精選(6.1)
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
1. The subdivision of major project deliverables, as identified in the scope statement, into smaller, more manageable components is called:
a. parametric estimation.
b. scope definition.
c. feasibility analysis.
d. benefit-cost analysis.
2. The process of establishing clear and achievable objectives, measuring their achievement, and adjusting performance in accordance with the results of the measurement is called:
a. strategic planning.
b. alternative objectives inventory.
c. management by objectives.
d. contingency planning.
3. A fundamental tenet of modern quality management holds that quality is most likely to be achieved by:
a. planning it into the project.
b. developing final inspections for quality.
c. striving to do the best job possible.
d. conducting quality circle activities.
4. The time-phased budget that will be used to measure and monitor cost performance in he project is called the:
a. work breakdown structure.
b. project schedule.
c. cost baseline.
d. cost budget.
5. At XYZ Inc., the hourly wage for semi-skilled workers is .00. The annual audit shows that fringe benefits cost 30% of basic wages, and that overhead costs are 60% of wages plus fringe benefits. What is the “l(fā)oaded” hourly wage for a semi-skilled worker at XYZ Inc.?
a. .40.
b. .60.
c. .12.
d. .33.
6. When there is uncertainty associated with one or more aspects of the project, one of the first steps to take is to:
a. revise project plan.
b. conduct a risk-benefit analysis.
c. conduct a needs analysis.
d. increase the estimated cost.
7. A narrative description of products or services to be supplied under contract is called:
a. the project plan.
b. a statement of work.
c. an exception report.
d. Pareto analysis.
8. An example of scope verification is:
a. reviewing the performance of an installed software module.
b. managing changes to the project schedule.
c. decomposing the WBS to a work package level.
d. performing a benefit/cost analysis to determine if the project should proceed.
9. All of the following are examples of a source of scope change except:
a. a variation in government regulations.
b. failure to include a required feature in the design of a telecommunication system.
c. discovering a need to engage in bottom-up cost estimating.
d. introducing technology that was not available when scope was originally defined.
本文內(nèi)容來(lái)自自互聯(lián)網(wǎng)公開信息或用戶自發(fā)貢獻(xiàn),該文觀點(diǎn)僅代表作者本人,版權(quán)歸原作者所有。本站僅提供信息存儲(chǔ)空間服務(wù),不擁有所有權(quán),不承擔(dān)相關(guān)法律責(zé)任。若發(fā)現(xiàn)侵權(quán)或違規(guī)內(nèi)容請(qǐng)聯(lián)系電話4008352114或郵箱442699841@qq.com,核實(shí)后本網(wǎng)站將在24小時(shí)內(nèi)刪除侵權(quán)內(nèi)容。
本站推薦
- 1信息系統(tǒng)項(xiàng)目管理證書與PMP,為職業(yè)發(fā)展帶來(lái)的驚人機(jī)遇!
- 2信息系統(tǒng)項(xiàng)目管理師證書和pmp哪個(gè)更適合升職加薪?
- 3PMP項(xiàng)目管理泡軟件面臨的常見問(wèn)題與挑戰(zhàn)分析
- 4PMP考試通過(guò)率及考生滿意度提升至90%以上:量化軟件項(xiàng)目管理成果的研究與實(shí)現(xiàn)
- 5歡迎登陸PMP項(xiàng)目管理系統(tǒng)——提升項(xiàng)目成功率的專業(yè)平臺(tái)!
- 6pmp證書和系統(tǒng)項(xiàng)目管理證書助你開啟高薪項(xiàng)目管理職場(chǎng)之路
- 7pmp證書助你馳騁職場(chǎng)與信息系統(tǒng)項(xiàng)目管理高薪秘籍曝光
- 8pmp證書助你開啟國(guó)際項(xiàng)目管理大門和信息系統(tǒng)項(xiàng)目管理師引領(lǐng)國(guó)內(nèi)項(xiàng)目管理之路
- 9PMP證書加持系統(tǒng)集成項(xiàng)目管理,開啟職場(chǎng)晉升新捷徑