2010年PMP美國項目管理考試習題及答案五十九
QUEST 100 % inspection of output is:
A the best proven method to ensure quality
B is expensive, ineffective approach to quality management
C can never be, justified
D can still leave some defects undetected
E B and D only
參考答案:E
QUEST Quality control charts show a characteristic of the product or service against:
A the specification limits
B customer requirements
C control limits based on three standard deviations in each direction
D control limits based on six standard deviations in each direction
E A and D only
參考答案:C
QUEST Variables quality data are:
A quantitative or qualitative data
B quality data for which the product or service is designed and built
C reflect measurements on a continuous scale of a characteristic of the produce or service.
D Indicate management's understanding of the concept of variability
E B and C only
參考答案:E
QUEST Attributes quality data are:
A quantitative or qualitative data
B quality data for which the products or services is designed and built.
C reflect measurements on a continuous scale of a characteristic of the product or service
D indicate management's understanding of the concept of variability
E A and B only
參考答案:E

QUEST Which of the following are among Phil Crosby's "absolutes of quality'.
A the performance of standard is zero defects
B do everything right the first time, each time
C constantly improve each product and each service
D the measurement system is the cost of nonconformance
E A and D only
參考答案:E
相關試題:
2010年PMP美國項目管理考試習題及答案五十八
試題推薦:
2010年PMP美國項目管理認定考試全真模擬試題精選1
2010年PMP美國項目管理認定考試全真模擬試題精選2
2010年PMP美國項目管理認定考試全真模擬試題精選3
本文內容來自自互聯(lián)網(wǎng)公開信息或用戶自發(fā)貢獻,該文觀點僅代表作者本人,版權歸原作者所有。本站僅提供信息存儲空間服務,不擁有所有權,不承擔相關法律責任。若發(fā)現(xiàn)侵權或違規(guī)內容請聯(lián)系電話4008352114或郵箱442699841@qq.com,核實后本網(wǎng)站將在24小時內刪除侵權內容。