PMP認證考試練習題(十一)(中英文)
1. A door panel for a new car is inspected prior to installation on the automobile. This is an example of:
Prevention
Variable Sampling
Quality Assurance
Quality Control
新汽車的儀表盤在安裝前已經(jīng)被檢驗. 這是下列那一種的例子:
預防
可變樣本
質(zhì)量保證
質(zhì)量控制
2. A thunderstorm caused intermittent power outages during a 24-hour period. When the day’s production run was sampled it was found that over 50% of the products produced were defective. These defects are an example of :
Variable sampling
Special causes
Prevention
Inspection
Random causes
一場雷暴造成24小時的停電. 白天生產(chǎn)的產(chǎn)品被發(fā)現(xiàn)有50%的不合格. 此種不合格是下列那一個的例子:
可變樣本
特殊原因
預防性
檢查
隨即原因

3. A:PM wanted to show management ,visually, how quality controls were affecting processes. the best tool to accomplish this is :
diagrams
Histograms
Flowcharts
Control charts
Statistical samples
項目經(jīng)理想向管理層顯示可視的質(zhì)量控制對過程的影響. 完成它最好的工具是:
Pareto 圖
柱狀圖
流程圖
控制圖
統(tǒng)計樣本
4. A PM is developing the projects budget and wants to have adequate resources to implement a solid quality control program. His project will cost approximately $110.00.What is the minimum amount he should include in the project budget for the quality program?
$10,000
$7,500
$6,135
$3,300
$5,500
一個項目經(jīng)理正項目預算同時想使用適當?shù)馁Y源完成穩(wěn)固的質(zhì)量控制程序. 它的項目成本大約是$110.00,他應當在項目預算中對質(zhì)量的預算最少做多少?
$10,000
$7,500
$6,135
$3,300
$5,500
5. Repeating the initiating processes at the beginning of each phase to keep the project focused on:
Interaction between phases.
The details of the project using rolling wave planning
Process group overlapping within each phase.
Business needs.
在每一階段初期重復立項過程以保證項目著重于:
階段間的交互
項目運用滾動波浪計劃的細節(jié)
在每一階段工藝組有重疊
商業(yè)需要
6. In the integration management process, the project development uses the outputs of the other planning processes to create a consistent, coherent document that can be used to guide both project______
Execution, control
Control, termination
Scope management, integration
Initiation and close-out.
在綜合管理程序中,項目開展使用其他計劃過程的輸出以形成一個持續(xù)的,連貫的文件以便用于同時指導項目的___.
實施,控制
控制, 終止
范圍管理,綜合
立項,收尾
7. Of the PMBOKTM’s five project management process groups, which group is a common thread that spans the majority of these processes from the start to finish?
Executing
Planning
Controlling
Initiating
Closing
PMBOKTM’s的五個項目管理過程組中,哪一個過程組由始至終作為共同的線索跨越了絕大多數(shù)的過程?
實施
計劃
控制
立項
收尾
本文內(nèi)容來自自互聯(lián)網(wǎng)公開信息或用戶自發(fā)貢獻,該文觀點僅代表作者本人,版權歸原作者所有。本站僅提供信息存儲空間服務,不擁有所有權,不承擔相關法律責任。若發(fā)現(xiàn)侵權或違規(guī)內(nèi)容請聯(lián)系電話4008352114或郵箱442699841@qq.com,核實后本網(wǎng)站將在24小時內(nèi)刪除侵權內(nèi)容。
本站推薦
- 1信息系統(tǒng)項目管理證書與PMP,為職業(yè)發(fā)展帶來的驚人機遇!
- 2信息系統(tǒng)項目管理師證書和pmp哪個更適合升職加薪?
- 3PMP項目管理泡軟件面臨的常見問題與挑戰(zhàn)分析
- 4PMP考試通過率及考生滿意度提升至90%以上:量化軟件項目管理成果的研究與實現(xiàn)
- 5歡迎登陸PMP項目管理系統(tǒng)——提升項目成功率的專業(yè)平臺!
- 6pmp證書和系統(tǒng)項目管理證書助你開啟高薪項目管理職場之路
- 7pmp證書助你馳騁職場與信息系統(tǒng)項目管理高薪秘籍曝光
- 8pmp證書助你開啟國際項目管理大門和信息系統(tǒng)項目管理師引領國內(nèi)項目管理之路
- 9PMP證書加持系統(tǒng)集成項目管理,開啟職場晉升新捷徑