Qustions 1:The output of scope change control consists of--
a. Scope changes, corrective action, and lessons learned
b. Corrective action, scope changes, and project plan updates
c. Performance measurement, additional planning, and lessons learned
d. Work results, product documentation, and formal acceptance
Qustions 3:
The scope statement--
a. Dose not include project objectives such as cost, schedule, or quality measures
b. Includes a description of project assumptions and constraints
c. Provides a documented basis for preparing the PERT/CPM network
d. Describes how the WBS will be structured
Qustions 5:
To relate the functional organizations to the WBS elements, the project manager should use a--
a. WBS index
b. Project WBS
c. Cost account matrix
d. Work package assignment idex
Qustions 2:
All the following are project selection methods except--
a. Logical Framework analysis
b. Analytic Hierarchy process
c. Expert judgment
d. Decision trees
Qustions 4:
The project charter should be issued by--
a. The project manager
b. The head of the performing organization
c. A manager external to the project
d. The project sponsor
Qustions 6:
Completion of project scope activities is measured against the --
a. Requirements
b. Project plan
c. Scope management plan
d. WBS
本文內(nèi)容來(lái)自自互聯(lián)網(wǎng)公開信息或用戶自發(fā)貢獻(xiàn),該文觀點(diǎn)僅代表作者本人,版權(quán)歸原作者所有。本站僅提供信息存儲(chǔ)空間服務(wù),不擁有所有權(quán),不承擔(dān)相關(guān)法律責(zé)任。若發(fā)現(xiàn)侵權(quán)或違規(guī)內(nèi)容請(qǐng)聯(lián)系電話4008352114或郵箱442699841@qq.com,核實(shí)后本網(wǎng)站將在24小時(shí)內(nèi)刪除侵權(quán)內(nèi)容。
本站推薦
- 1信息系統(tǒng)項(xiàng)目管理證書與PMP,為職業(yè)發(fā)展帶來(lái)的驚人機(jī)遇!
- 2信息系統(tǒng)項(xiàng)目管理師證書和pmp哪個(gè)更適合升職加薪?
- 3PMP項(xiàng)目管理泡軟件面臨的常見問(wèn)題與挑戰(zhàn)分析
- 4PMP考試通過(guò)率及考生滿意度提升至90%以上:量化軟件項(xiàng)目管理成果的研究與實(shí)現(xiàn)
- 5歡迎登陸PMP項(xiàng)目管理系統(tǒng)——提升項(xiàng)目成功率的專業(yè)平臺(tái)!
- 6pmp證書和系統(tǒng)項(xiàng)目管理證書助你開啟高薪項(xiàng)目管理職場(chǎng)之路
- 7pmp證書助你馳騁職場(chǎng)與信息系統(tǒng)項(xiàng)目管理高薪秘籍曝光
- 8pmp證書助你開啟國(guó)際項(xiàng)目管理大門和信息系統(tǒng)項(xiàng)目管理師引領(lǐng)國(guó)內(nèi)項(xiàng)目管理之路
- 9PMP證書加持系統(tǒng)集成項(xiàng)目管理,開啟職場(chǎng)晉升新捷徑