監(jiān)理公司管理系統(tǒng) | 工程企業(yè)管理系統(tǒng) | OA系統(tǒng) | ERP系統(tǒng) | 造價咨詢管理系統(tǒng) | 工程設(shè)計管理系統(tǒng) | 甲方項目管理系統(tǒng) | 簽約案例 | 客戶案例 | 在線試用
X 關(guān)閉
軟件項目管理工具

當前位置:工程項目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項目管理工具

PMP認證考試練習題(二十二)(中英文)

申請免費試用、咨詢電話:400-8352-114

1. During the implementation phase of a new systems project, a fire erupts during hardware installation causing damage to the facility. This is an example of:
Unpredictable risk
External risk
Business risk
Insurable (pure) risk

在一個新系統(tǒng)項目的實施階段中,硬件安裝期間突發(fā)火災,造成對設(shè)備的損害 . 這是一個什么例子:
a. 不可預測的風險
b. 外部風險
c. 商業(yè)風險
d. 可保險的 (純粹的) 風險

2. Which of the following is not an example of an external-predictable risk?
Cost of money
Borrowing rates
Material availability
Operations issues

下列哪一個不是外部可預期風險的例子?
a. 貨幣成本
b. 租借費用
c. 有可用的材料
d. 操作問題

3. The tool that is based on the concept that the majority of quality problems are caused by a few causes is called:
Pareto analysis
PERT Analysis
Root Cause Analysis
Capability study

大多數(shù)質(zhì)量問題是由于幾個主要因素所導致,基于這樣一個概念的工具稱為:
a. 巴雷托Pareto分析
b. 計劃評審技術(shù)PERT分析
c. 根本原因分析
d. 能力研究

4. The cost of quality includes all of the following, except:
Appraisal cost
Internal failure
Prevention cost
Operation and maintenance cost

質(zhì)量成本包括所有下列事項,除了:
a. 評估成本
b. 內(nèi)部失效
c. 預防成本
d. 操作維修成本

5. When an employee is terminated from a project, the project manager is enforcing
Power.
Legitimate (Formal)
Coercive (Penalty)
Expert
Referent

當要求一個員工離開項目時,項目經(jīng)理在執(zhí)行實施什么權(quán)力
a. 合法權(quán)(正式的)
b. 強制權(quán)(處罰性的)
c. 專家權(quán)
d. 象征權(quán)

6. Joan is building her project team and is considering the resources she will need to work on the project. Choosing the right people is essential. However, the right people are not always available. In order to ensure she can set up her project organization properly, Joan will need to look for all but one of the following:
Will the most desirable individuals be available when she needs them?
Have the individuals performed this kind of project work in the past?
Are the candidates organizationally related to the sponsor?
Are they likely to work well together as a team?

Joan正要創(chuàng)建自己的項目團隊,考慮項目工作所需要的資源. 選擇適當?shù)娜耸潜夭豢缮俚? 然而,適當?shù)娜瞬皇请S時都可找到. 為了確保能適當?shù)亟㈨椖拷M織,Joan將需要尋找所有下列事項,除了:
a. 當需要適當?shù)娜藭r,最想要的人是否可用?
b. 過去是否有人完成過這類項目工作?
c. 候選人是否與業(yè)主有組織關(guān)聯(lián)?
d. 他們能否作為團隊一起工作得很好?

7. Tom is a member of a matrixed project team. In this capacity, what should he typically not be concerned about?
Serving two managers
How his performance evaluation will be handled
Where his loyalties should be placed
Creating the project charter

Tom是矩陣式項目團隊成員. 在這種組織關(guān)系中,他通常不應(yīng)該考慮什么?
a. 為兩個經(jīng)理服務(wù)
b. 他的績效評價將被怎樣處理?
c. 他的忠誠有什么價值地位?
d. 制定項目章程

網(wǎng)站提醒和聲明

本文內(nèi)容來自自互聯(lián)網(wǎng)公開信息或用戶自發(fā)貢獻,該文觀點僅代表作者本人,版權(quán)歸原作者所有。本站僅提供信息存儲空間服務(wù),不擁有所有權(quán),不承擔相關(guān)法律責任。若發(fā)現(xiàn)侵權(quán)或違規(guī)內(nèi)容請聯(lián)系電話4008352114或郵箱442699841@qq.com,核實后本網(wǎng)站將在24小時內(nèi)刪除侵權(quán)內(nèi)容。

發(fā)布:2026-02-28 10:02    編輯:xiaona    [打印此頁]    [關(guān)閉]

泛普軟件項目管理工具其他應(yīng)用

項目管理工具 禪道項目管理軟件 夢龍項目管理軟件 微軟項目管理軟件 裝飾管理系統(tǒng) 裝修預算軟件 項目計劃軟件 項目進度管理軟件 軟件項目管理工具 材料管理軟件 工程項目管理軟件系統(tǒng) 項目管理系統(tǒng) 施工管理軟件 建筑工程項目管理軟件 工程管理軟件